In revision. The foundation slab is being redrawn under the Phase A corrective package to add insulation, a damp-proof membrane and a capillary break. No thermal figure is published for it and the current drawing is not issued. The detail number is shown rather than omitted, because a gap in a numbered sequence raises more questions than a stated revision does.
Foundation slab
510 mm
Total thickness · D.06
The layer schedule for this detail is being transcribed from the construction details catalogue and signed off by the technical department. The total thickness above is confirmed. Contact the technical department for the current build-up on a live scheme.
Layer schedule
The layer schedule for D.06 is being transcribed from the construction details catalogue and signed off by the technical department. The confirmed total thickness is 510 mm.
Performance
| Property | Value | Basis |
|---|---|---|
| Self-weight | 1200 kg/m² | Mass estimate from the layers and dimensions in the source document. |
| Fire resistance (EI) | Test programme in progress — contact technical department | Awaiting laboratory test report |
| Airborne sound reduction (R_A) | Test programme in progress — contact technical department | Awaiting laboratory test report |
| Watertightness | Test programme in progress — contact technical department | Awaiting laboratory test report |
Not yet stated
- EIFire resistance · in test
- R_AAirborne sound reduction · in test
- watertightnessWatertightness · in test
Test programme in progress — contact technical department