Foundation slab

510 mm
Total thickness · D.06

The layer schedule for this detail is being transcribed from the construction details catalogue and signed off by the technical department. The total thickness above is confirmed. Contact the technical department for the current build-up on a live scheme.

Layer schedule

The layer schedule for D.06 is being transcribed from the construction details catalogue and signed off by the technical department. The confirmed total thickness is 510 mm.

Performance

D.06 · performance
Property Value Basis
Self-weight 1200 kg/m² Mass estimate from the layers and dimensions in the source document.
Fire resistance (EI) Test programme in progress — contact technical department Awaiting laboratory test report
Airborne sound reduction (R_A) Test programme in progress — contact technical department Awaiting laboratory test report
Watertightness Test programme in progress — contact technical department Awaiting laboratory test report

Not yet stated

  • EIFire resistance · in test
  • R_AAirborne sound reduction · in test
  • watertightnessWatertightness · in test

Test programme in progress — contact technical department

In revision. The foundation slab is being redrawn under the Phase A corrective package to add insulation, a damp-proof membrane and a capillary break. No thermal figure is published for it and the current drawing is not issued. The detail number is shown rather than omitted, because a gap in a numbered sequence raises more questions than a stated revision does.