Regulatory position — CTE DB-HE

The vertical envelope and roof build-ups comply with the most demanding Spanish climate zone without modification, and are therefore suitable for continental European projects as drawn.

CTE DB-HE
Element Calculated U Zone α (Canaries) Zone C (mainland) Zone E (mountain)
Façade (D.02) 0.43 W/m²K ≤ 1.20 Complies ≤ 0.60 Complies ≤ 0.45 Complies
Roof (D.08 / D.09) 0.21 W/m²K ≤ 0.65 Complies ≤ 0.40 Complies ≤ 0.30 Complies

Limits are the CTE DB-HE maximum transmittance for each climate zone. Calculated values are taken from the detail records, so a corrected U-value updates this table with them.

Floor-over-ground is omitted from this table pending the D.06 revision.