For contractors

Sequence and interfaces.

What arrives on site

Manufactured panels, Placner sheet and INSULTERM 600 in bags.

Site sequence

Erect the frame · sheath with Placner · insulate the cavity · spray the external INSULTERM 600 · apply the monocapa render.

The two rules that matter

Services on the wet face of D.05 must be set out before spraying. There is no chasing afterwards.

The external INSULTERM 600 must not break at floor and roof junctions. A discontinuity there forfeits most of the thermal advantage the detail exists to deliver.

Interfaces

The junction detail library J.01–J.08 is in preparation and is available on request in the meantime.